- one of the largest uranium reserves
- a well respected and safe nuclear design in CANDU
- experience with building and refurbishing nuclear reactors(Darlington)
and for Ontario itself A need for more baseload to work with the large amount of solar and wind that Ontario has added in the last 10 years.
Saskatchewan also now has a potential need for nuclear for industrial use now that wasn't present before from its existing population.
if the government can clear the red tape by using a well tested reactor design then they could certainly get some of these reactors built in that time frame.
15 seems...ambitions, but if we're going to spend at a federal level this is probably one of the better things to invest in.
If they can make them cookie cutter as much as possible and not unique snowflakes like has been the pattern at least in the US, they can probably do it both on the timeline and a somewhat reasonable cost basis
If they build 15 individual projects instead of managing this as a single big project, yeah that is very ambitious
What is exciting to me is that these just installed the first module of the BWRX 300 at Darlington. I was so afraid that BWRX was going to be another SMR that gets talked about for decades but it looks like they are really doing it. See https://www.autonocion.com/us/canada-tonne-grid-nuclear-reac... !
Chasing baseload is a fool's game. You will always have a mismatch between power needed and power produced. Power storage is necessary to move excess power produced to times of excess power need. e.g., shave the peaks to fill the valleys.
Any storage reduces the need for baseload and peaker plants. 4-6 hrs move daytime excess solar to fill evening needs. Overnight baseload excess can refill the batteries to cover the morning excess need before solar fully kicks in. Expanding battery capacity to 8-12 hours further reduces the need for expensive power sources such as nuclear and gas.
https://news.ontario.ca/en/release/1007558/ontario-delivers-...
France built 55 reactors in around 15 years during its first build-out and that wasn't an accident, we both know how to do this and Canada seems to be in a good place for that kind of performance.
- is very far North and can't really use solar at all for 3 month per year because in winter the nights are long, the weather is terrible and the sun is always low in the sky.
That's not serious. Construction start is too far away.
0 - https://www.neimagazine.com/news/darlington-smr-secures-fina...
As in the UK we were previously asking a French-Chinese partnership to build here so not sure why Canada didn’t get chosen for that.
So, yeah, it makes sense that they love nuclear now -- blank cheque to drag on for multidecades over budget. Likely the right people donated the right funds to the PC party and/or attended/funded Ford Fest
The first thing this government did when it got into power was pay out hundreds of millions in penalties for cancelling large wind projects, and for breaching its contract and exiting the cap and trade agreement with California and Quebec.
Ford loves to waste money and then wag his finger about how everyone else is fiscally irresponsible.
I can't help but think its a sign that those concerns were easy to hold when energy was cheap and you could actually trust your neighbors. If that's the case, again huge speculation, it sure makes the concerns feel a bit hollow now.
I think it's better to just outsource it to Koreans at least that way you can stay on budget and on time.
2005 ish - UK government release energy strategy and declares fission power plant intent.
2010 ish - UK government formally announces Hinkley Point site. It's declared the first reactor will come online 2019.
2019 - it does not.
2026 - best estimate is now 'around 2030'.
Historical cost estimates are an utter quagmire - but roughly estimated at £18 billion a decade ago, back when it was estimated to be online last year.
Current estimates - bring your own hubris - are roughly £46 billion.
This story has been beaten to death, I know - but recall, this is a country with some history of building and operating nuclear fission power plants, with convenient (2h by rail) access to a lot of expertise from France, and it's a joint-venture with China General Nuclear Power Group so presumably plenty of expertise to draw upon there.
Even if Canada winds up relying more on CANDU reactors than SMR's, there is a case to be made for enriching domestically. There are a lot of potential customers looking for a reliable, ethical supplier. Canada has the raw minerals, political stability, and a long record of refusing to weaponize despite having the capability.
Jokes aside, Canada is well positioned to lead a nuclear renaissance, now that they have easy access to raw materials, easy access to cooling facilities and they can export surplus to energy hungry neighbor, it also makes it a good candidate for hosting lots of datacenters
Honest question; here in the USA we have not.
I hope Jimmy Carter's ghost will be just as willing to help us out the next time a reactor goes into meltdown as his physical self was the first time that happened. RIP Jimmy Carter.
We should have more nuclear, but they should be run for profit to hold them to account instead of massively indebting them to create public sector crony slush funds the way the current hydroelectric system has been run into the ground.
Just ONE square mile of batteries and a TOTAL of 100 x 100 square miles of Solar can power the entire USA 24/7. Area required will be much lesser for Canada.
See : https://finance.yahoo.com/sectors/energy/articles/elon-musk-...
just join the US already
Relying on Trump or any other clown, makes no more sense.
Wind and solar could be deployed for a fraction of the proposed $100 billion investment and should be considered as part of the interim solution, while nuclear remains a long-term strategic project.
Rather than pursuing such an ambitious build out, a more practical approach might be to scale back the plan and focus on constructing one reactor each in Alberta, Saskatchewan, and Manitoba as an initial phase.